We spend the most of July on designing machines working in steelworks and rolling mills.
While designing we had to face many engineering challenges such as difficult working
conditions of designed machines, two lifting mechanisms (main the ancillary), unique
auxiliary equipments (graspers and traverses) and finally how to protect the machine
from high temperatures. The final cranes with lifting capacity of 50 and 120 tones were
calculated using the most up-to-date EN’s standards for hoists.